How to arrange a summer water supply in the country for
If a territory for growing crops is set aside on the territory of the suburban real estate, it should be watered regularly. You can organize a summer water supply in the country with their own hands, especially if the distance to the source is very large. In this case, the piping system can be laid directly on the ground, since in winter it is not necessary to operate it.

Advantages of the terrestrial network
Laying the elements without penetration into the soil allows you to avoid carrying out labor-intensive work, which leads to saving time and effort. That is, the process of digging a trench, which is necessary for the construction of an autonomous system for a house, is no longer possible.
Evaluate the benefits of this option is offered below.
- Mounting technology is not complex, therefore makes it possible to self-erect.
- No earthworks allows you to assemble the system in all weather conditions.
- If necessary, the malfunction can be eliminated without any difficulties..
- In an emergency, the pipes for the summer water supply system at the dacha are quite realistic to dismantle and install in another place..

Note! Since all network elements are outside, there is a certain risk that they can be damaged during careless operation. However, open access simplifies repairs.
Used items
When the summer water pipeline is laid in the country, before installation, the pipes are selected from which the system will be formed. Products from various materials are suitable for this purpose, but the best option is to use plastic products.
The number of elements will depend on the length of the network. At the device it is possible to use PND pipes having a different diameter. For the installation of the main water supply channels, it is recommended to purchase products with a diameter of 40 mm, and for final wiring - 25 or 32 mm.

Special fittings are used as connecting parts. These can be tees, angles or direct analogues. Their price is relatively low, so a small amount is added to the main expenses.
Work
The time has come to learn how to spend summer summer water supply with your own hands without carrying out earthworks. With its help, it will be possible to ensure not only high-quality watering of the plot with seedlings, but also to carry out the delivery of water to the desired object in the warm season. Typically, such a system can be operated from May to September.
Design stage
Proper network design is possible only if a project is drawn up that will reflect the points of consumption of the working environment, paths, structures and other important points. The plan for summer water supply in the country with their own hands should be implemented, so that the extra money is not spent.

On paper, you must specify the place of discharge of water, because before the frost should completely remove the liquid from the system. In the direction of this point is a small slope, for which you can install various lining of metal or wooden elements.
Connect to source
In this case, there are two options, one of which involves the connection of pipelines to a centralized branch or to a separate source. As such, it can act as a normal well, and a natural reservoir. For the intake of water is usually installed pump.
A hydraulic device is usually submerged in a well or well, which functions only if the fluid is above the shell. Such a device makes it possible to lift water from a depth of more than 5-10 m. In order to connect to a centralized system, it is sufficient to install a special adapter.

A pump that is immersed in a liquid should not touch the bottom; therefore, it is necessary to suspend it. Usually made mounting frame from metal corners 5050 mm. With its help the cable on which the hydraulic device is fixed is held.
Automation of work is performed using a special relay and accumulator, playing the role of a transfer point. Such a tank avoids frequent switching on and off of the pumped device. If, in addition to irrigation, it is intended to use water for other purposes, then it is possible to create a system with a water heater.
Pipe connection
Elements of polyethylene can dock in various ways, but some of them do not make sense when using the summer system. For example, the method of welding pipes is not relevant for such networks. In addition, it is allowed to use when the diameter of the pipelines more than 63 mm.

The most suitable option is the connection using compression fittings for pipes that allow joining components with a cross section of 16 to 110 mm.
Installation instructions are given below.
- First, an element of the desired length is cut off directly at a right angle, after which the burrs are removed from the edges.
- Next is the depth of insertion of the component. The pipe is then inserted into the fitting through a ring for clamping to the pre-stop.
- Now, a fragment of the system is pushed through the seal into the limiter, and the depth of entry is necessarily checked.
- At the final stage, the nut is tightened with sufficient force. If the cross section of the pipe does not exceed 32 mm, then the twisting can be done manually.

Attention! When doing water supply for the summer, you can also use flange or crimp fittings for joining individual fragments. Fixed connection methods will not allow disassembly if necessary.
Installation of water tap
Outside, you can install a ball valve with a removable fitting designed to connect a garden hose. This product meets all the requirements of GOST 19681, reflecting the basic requirements. It should be used at the temperature conditions specified in the table with the technical parameters of the product.
Coupling connection should be performed using a special material - fluoroplastic sealer. In the course of work, lever keys belonging to the first or second category should be used. With the help of the tool, the hexagon is directly affected.
Flexible hoses must be attached to the water dispenser using traditional screw clamps. It is forbidden to fix elements using various wires. When carrying out installation work, the torque reflected in the technical documentation should not be exceeded.

Testing the created branch
After completion of the assembly of the main elements of the need to check the functioning of the system. If in the process of testing there are leaks, you should turn off the water supply and dismantle the fittings or water fittings. The installation must be performed again taking into account all the rules and additional recommendations for installation.
As a conclusion
This guide should help to implement the device summer water in the country without digging the pipelines into the ground. Such a system is easy to erect, so it is ideal for use in suburban areas. However, to create a reliable network, you need to know what to make it from. Additional information on the topic can be taken from the video in this article.