Man can not live without water. The recommended consumption rate is 2 liters per day. If you live in a private house, then you have an amazing opportunity to drill a well under water and enjoy it for free in its pure form and in any quantities necessary for you.
In this article, we will examine step by step the entire boring process.

Preparatory work
In principle, all activities can result in hiring professionals with special equipment. Cost - to drill a well for water in 2013 was about 2,000 rubles per linear meter. 10-15 m of excavation works cost 20000-30000 monetary units.
To date, this figure, taking into account the price increase may be much higher.
If you have a desire to save, then proceed:
- First of all, we learn from our neighbors or in the district administration the depth of our target and the type of obstructive soil.. If the distance to the water is more than twenty meters or if there is soil containing stones on the way, you will still have to call in specialists with the appropriate equipment.
Tip: You can also purchase a drilling rig in your own farm. Its high price can pay off over time by renting it out.

- If the underground river is located at a distance of less than two tens of meters to the surface, we continue preparatory activities and determine the diameter of the well.. The recommended thickness of the pipe being lowered inside is 12-13 cm, which means that the drill will fit a fifteen centimeter.

- Choose the lowest point in the area of your site.
It is important to know: the selected site should be sufficiently removed from possible sources of pollution. In the opposite case, you will have to break through to the artesian level to ensure the purity of the produced water.

- We dig up with our own hands a hole with a size of one and a half and a half meters and a depth of about one meter.. This will prevent the edges of the pit from shedding.
Putting the tripod

Drill a hole in the water without a stable tripod will not work.
Therefore, we collect the appropriate design:
- We take three bars or iron pipes.
- We lay out of them on the ground as shown in the figure:

- Drill a through hole through all three products.
- We connect them with a metal pipe, which we firmly fix.
- Winch mounted between the two extreme supports.
Drilling
For different layers of the earth different boers are used. The most commonly used coil.
The instruction for its use is as follows:
- Together with the assistant we turn the drill in two handles clockwise until it fully enters the soil.

- With the help of the winch we take out the instrument and clean it from the ground.
- When the drill is lowered to its full length, we increase it with the help of steel rods.
- We continue the process before the collision with water.

- We are waiting for the hour of filling the pit with liquid.
- We pump it out until it becomes transparent.
- We take a sample and give it to the laboratory to check on the suitability of consumption.
- After a day we check the level of water intake, it should be at least several meters.
- Using a shell, we clean and level the walls of the well from the crumbling soil. This process is performed by the shock rope method.

- After cleaning the well to the hard bottom we fall asleep with its twenty-centimeter layer of rubble.
- We lower the pipe with the fine mesh screen filter device fitted for the well.
Tip: the pipe is recommended to use polyethylene or made of stainless steel. Since regular contact with water from a product of ordinary iron will immediately cause destructive corrosive processes.
- If there is no ready-made filter for the well, we make it with our own hands: We drill holes with diameters of 5 mm in 5-meter increments of 5 cm at the bottom meter of the pipe. Wrap the treated area in a fine mesh in several layers. Fix the winding clamps.
- Measure out the number of required pipes and lower them in turn, helping with a wooden hammer if necessary.
- The space between the pipe and the ground is filled with cement-sand mixture.
- From above we install a canopy to protect against precipitation into the well.
- This is followed by the installation of the water pumping station and the wiring of the water supply system from the well to the house.
- At this installation work is over, and you can enjoy your own source.
Conclusion

How much does it cost to drill a well for water? If you order a group of specialists with equipment, it is expensive. If you do everything yourself, then it is quite possible to do without significant costs. But then clean, free water in any quantities and at any time will be available to you.
The important point is the creation of a reliable tripod. It will become a support for further work. Further, only physical strength and patience are required.
After reaching the desired water, be sure to check its quality in the laboratory. You may need to use additional filters.
The video in this article will acquaint you with additional materials relating to the topic in question. Water is the source of life. The presence of its own well on the site significantly increases its functionality and comfort.